Project progress & analysis
01 · The article programme
19 published.
211 still to build out.
Most of the library is already open to read. This programme deepens those pages through source-led research and adds a small set of new site studies.
- Enrichments published
- 19of 230 commissions · 8.3%
- Editorial pages available
- 21812 additional pages planned
- Queued
- 2110 in progress · 0 marked blocked
- Words in published enrichments
- 26,373Recorded article lengths, not net words added
8.3% of commissions measures completed article enrichments only; it does not measure how much of the website works or how many of its claims are verified.
- Published
- Next
- Queued
19 / 230 ENRICHMENTS PUBLISHED
- Published
- Next
- Queued
Temples and sites10 / 29
Case studies9 / 10
Unit dossiers0 / 191
- Published
- Next
- Queued
02 · Every lane of the plan
Research, design and reliable tools.
Article enrichment is one lane of 9 phases that also cover evidence, unit graphics, six converters, site quality, search measurement and reader discovery. Each phase keeps its own measure; there is no blended completion score.
- Phases complete
- 1of 9 · 2 blocked
- Acceptance steps
- 10of 39 complete
- Enrichments
- 19of 230 commissions
- Unit graphics
- 0of 191 upgrades
- Converter reviews
- 0of 6 tools accepted
- Research works
- 6417,659 pages held
- Complete
- Under way
- Queued
- Blocked
Open a phase to read its acceptance steps.
P0Scope and project controlsComplete1 / 1 acceptance milestones
Maintain the register at each material session close.
Depends on: No earlier phase
Current plan, history and full-scope register reconciledComplete
Keep one current plan, one history and reconciled phase, editorial and visual registers.
P1Evidence and data integrityUnder way2 / 5 acceptance milestones
Continue unit metadata checks. Olympia now distinguishes reported dimensions from rounded factors and site-selected allowances.
Depends on: No earlier phase
Research holdings and finding aids registeredComplete
Registered holdings and finding aids remain distinct from verified claims.
Audit matrix definitions, periods, rounding and historical variantsUnder way
Every retained unit has checked quantity, period, region, provenance, precision and uncertainty; shared outputs agree.
Close source gaps for every retained commissionQueued
Every retained argument has checked evidence; original suggestions may be reconceived, merged or retired with recorded reasons and reconciled scope.
Five visual specimen definitions and metadata pitfalls reviewedComplete
Five family specimens and their metadata pitfalls have dated evidence.
Quotation, attribution and evidence-label integrityQueued
Verify retained quotations, locators, rights and measured versus reconstructed or interpretive labels against original sources; close discrepancies across related pages.
P2Editorial enrichmentUnder way19 / 230 enrichments
Seventeen of nineteen published studies have recorded scholarship assessments. Review There Was No Single Greek Foot next, then What Petrie Actually Gave Us at Giza before Unas.
Depends on: Evidence and data integrity
Recheck published studies and their completion claimsUnder way
Recheck all currently published enrichments against their source and release evidence; record the reviewed cohort and resolve or explicitly flag any failed claim. This audit does not add published articles.
Score published studies for a clear narrative and revise those that failComplete
Score every currently published enrichment against the article plan's seven-criterion narrative rubric; record scores and failing criteria; revise only failing pages through the normal article gates. This audit does not add published articles.
Review original analysis, evidence and article purposeUnder way
Reassess the retained corpus for distinct source-based analysis; reconceive, replace, merge or retire weak topics, reconcile priorities/scope, and apply hard gates plus weighted coverage and editorial review. Existing publication is not an exemption.
P3Unit infographic upgradesUnder way0 / 191 visual upgrades
Five family specimens checked. Publish each individual upgrade with its source-led unit enrichment.
Depends on: Evidence and data integrity
Five family design specimens validated; individual upgrades remain separateComplete
Five exemplar families are validated; each of the 191 units still requires individual acceptance.
P4Converter and interaction assuranceQueued0 / 6 acceptance milestones
Verify dimensional consistency, boundary inputs, uncertainty, shared links and source alignment across all six tools.
Depends on: Evidence and data integrity
Length converter acceptance reviewQueued
Check independent calculations, dimensions, round trips, boundary and invalid inputs, precision, uncertainty, share links and keyboard operation.
Weight converter acceptance reviewQueued
Check independent calculations, dimensions, round trips, boundary and invalid inputs, precision, uncertainty, share links and keyboard operation.
Time converter acceptance reviewQueued
Check independent calculations, dimensions, round trips, boundary and invalid inputs, precision, uncertainty, share links and keyboard operation.
Liquid converter acceptance reviewQueued
Check independent calculations, dimensions, round trips, boundary and invalid inputs, precision, uncertainty, share links and keyboard operation.
Area converter acceptance reviewQueued
Check independent calculations, dimensions, round trips, boundary and invalid inputs, precision, uncertainty, share links and keyboard operation.
Treasure converter acceptance reviewQueued
Check independent calculations, dimensions, round trips, boundary and invalid inputs, precision, uncertainty, share links and keyboard operation.
P5Site quality and accessibilityUnder way5 / 14 acceptance milestones
Continue component and evidence-label review across unit pages. Khmer Hat has a bounded repair; wider acceptance remains open.
Depends on: No earlier phase
Responsive, keyboard, contrast and accessible diagramsUnder way
Review every template and interactive at desktop and 320/360 px, keyboard, focus, contrast, text resizing and reduced motion; close critical and high defects.
Routes, internal links, canonical, schema and sitemapQueued
All canonical routes, links, schema, sitemap, robots and branded error responses pass a dated site-wide audit.
Performance and resilient no-script behaviourQueued
Measure representative pages, no-script access and failure states; meet budgets or document justified exceptions.
Authorship, corrections, privacy and editorial standardsQueued
Verify visible authorship, contact, corrections, accessibility, privacy and editorial disclosures against current standards.
CSS remediation across production pages and generatorsComplete
All 261 production HTML pages contain no inline or embedded CSS; assets JavaScript contains no presentation-style writes; Units generator and both temple repairs pass source and rendered acceptance.
CSS source baseline: 261 pages inspected, 3 need repairComplete
Dated inventory identifies every HTML inline attribute and embedded style block; this is a source baseline, not visual acceptance.
Shared components and exemplar consistencyUnder way
Inventory production components and loaded styles, compare each component family with original design boards at desktop and mobile, consolidate repeated rules and repair generator drift without changing protected exemplars.
Reader-facing content and status accuracyUnder way
Audit articles, hubs, tools, Blog and policy pages for internal notes, stale completion claims, dead labels and unsupported badges; retain useful provenance and research uncertainty.
Image, font and page-weight reviewQueued
Inventory loaded assets, document budget exceptions, check image rights and useful alternatives, dimensions, modern formats, font scope and Core Web Vitals; optimise only with measured benefit.
Repeatable release checks for repaired defectsUnder way
Add targeted checks for CSS and generator regressions, completion evidence, public-field boundaries and component drift; prove checks reject representative bad fixtures before enforcing them.
Unlisted Test Lab, scoped styling and navigationComplete
Lab index and every lab page pass noindex, no advertising, main-CSS scope, pill, return links and sitemap exclusion checks.
Generated project status and first evidence-led prototypeComplete
Status derives from the canonical registers; one useful prototype passes evidence, responsive, interaction, no-script and public acceptance checks.
Recognisable temple heroes and approved exemplarsUnder way
Every available temple has a sourced architectural identity hero in addition to analytical visuals. Review all element examples each time; permanently preserve the eleven approved infographic exemplars. Planned temples meet the gate on creation.
Consistent article bibliographiesComplete
Use the shared Sources and Further Reading format. Preserve references and citation targets; pass responsive and generation checks.
P6Measurement and search evidenceBlocked0 / 3 acceptance milestones
Obtain current authenticated reports; old setup evidence is not a current traffic audit.
Blocked: Current authenticated search and analytics reports are required.
Depends on: No earlier phase
Reconcile a closed Search Console and analytics cohortBlocked
Reconcile like-for-like closed search and analytics windows, with scope and attribution limitations recorded.
Inspect current-sitemap coverage and representative canonicalsBlocked
Check current-sitemap coverage and representative canonical pages using authenticated reports.
Validate normal-traffic outcomes and key-event readinessBlocked
Verify normal-traffic outcomes and exclusions before key-event marking.
P7Reader discovery and return visitsQueued0 / 3 acceptance milestones
Build the verified-findings register and feed; publish only findings checked against released pages.
Depends on: Editorial enrichment
Recent verified pages with one useful sourced findingQueued
Each public finding has a released page, genuine verification date and checked evidence.
Validated Atom feed of newly verified pagesQueued
Validate feed IDs, dates, links, XML and discovery; report submission separately.
Evidence-led internal discovery and search opportunity reviewQueued
Review hubs, related studies, tools and sources for useful reading paths; new page ideas require distinct intent and evidence.
P8Programme acceptance and handoverBlocked0 / 3 acceptance milestones
Complete all finite work, reconcile evidence, then assess advertising eligibility and seek explicit submission approval.
Blocked: Earlier finite work and its acceptance evidence must be complete.
Depends on: Scope and project controls, Evidence and data integrity, Editorial enrichment, Unit infographic upgrades, Converter and interaction assurance, Site quality and accessibility, Measurement and search evidence, Reader discovery and return visits
Independent final content, visual, tool and quality reconciliationBlocked
Reconcile all finite work and evidence, with no unresolved critical or high defects.
Final public acceptance and scope closureBlocked
Verify final public content, tools, routes and scope closure.
Maintenance ownership, cadence and recovery handoverBlocked
Record maintenance ownership, cadence and tested recovery procedure.
03 · Where every commission stands
One square for every study.
Each square is one commission, grouped by block. Solid gold is a published enrichment, the dashed square is next, an open square awaits work or evidence and a dotted square is a page not yet built. Select a square to open its page.
Temples and sites
New site pages0 / 12
Units · Length
- Published
- Next
- Queued
- Page planned
04 · Unit graphics
Every unit, drawn individually.
All 191 unit dossiers receive an upgraded graphic, released with that unit's research. Five families share tested components where history and scale allow; assigning a family is not a completed upgrade.
05 · Depth and evidence
How deep, and on what.
06 · Recent and next
Latest studies, and what follows.
Temples · published
Stonehenge
3,274 words
Case Studies · published
Alexandria to Syene: What the Geometry Can Prove
1,236 words
Case Studies · published
Petrie’s Giza survey: dimensions, errors and cubit estimates
1,081 words
Case Studies · published
There Was No Single Greek Foot
1,015 words
Temples · next
Pyramid of Unas
Queued
Case Studies · after that
Ancient Measures for Historical Fiction
Queued
The next study follows queue priority and its evidence requirements; a missing source can change the order. This is not a publication schedule.
Continuing care
- Research and correction upkeepOn new evidence; quarterly review
- Technical, source-link and accessibility checksEach release; quarterly full audit
- Search and analytics reviewMonthly once reliable; weekly while resolving defects
- Technical Build Log and portfolio discoveryWhen a release provides a substantive useful entry
- Continuous improvement and progress reconciliationEvery material session; resolve eligible decisions and carry evidence forward
- Test Lab experiments and statusAs ideas arise; reconcile generated status at each material session
- Scholarly purpose and whole-site prioritiesEvery material session; revisit topics and scope when evidence changes
Recurring care sits outside finite completion and is never permanently finished. Advertising waits for the finite plan, evidenced eligibility and the owner's explicit approval.
07 · How we count
A measure needs a definition.
- Published
- An active commission recorded as a completed enrichment. It does not mean every page has been reviewed.
- Available
- Existing editorial detail pages. Hubs, tools, Blog and policy pages sit outside the article count.
- Acceptance step
- A named check a phase must pass, complete only with recorded evidence. Working tools are not unfinished because a review is queued.
- Words
- Recorded lengths of published articles. Length is context, not a quality score or a target to fill.
- Sources
- Registered research works and their page extents, not verified claims.
- Updates
- Regenerated with the homepage, temple and unit graphics whenever a material session closes. These are project figures, not visitor analytics.
No completion forecast is given: a unit dossier and a monument study can need very different amounts of research. Read the build log.